← Digital GF Assurance overview

02 / DOCUMENT · IN DEVELOPMENT

Sanitation & lockout documentation.

Make each required control visible.

Illustrative workflow · Not a live system

WHY THIS STAGE MATTERS

Document with a defined process.

A consistent record should show what was cleaned, what was isolated, which procedure was followed and who completed the work. Equipment lockouts must remain clear until authorized release.

Illustrative document workflow diagram
Illustrative concept artwork — not a photograph of a verified production event.

01 / CONTROL

Standardize

Present cleaning and segregation tasks in an equipment-specific sequence.

02 / CONTROL

Lock out

Identify equipment excluded from GF use with visible tags and controlled status.

03 / CONTROL

Record

Capture dates, operator completion, deviations and follow-up requirements.

SEE HOW IT COULD WORK

Inside the document record.

A practical illustration of the information BIG proposes to configure for each facility.

Examples shown are demonstrations only. No information entered here is saved, transmitted or used for production decisions.

INTERACTIVE EXAMPLE / SANITATION CHECKLIST

Depositor DP-01

Try checking the sample tasks. This demonstration does not save records or authorize equipment.

0 of 4 example steps complete

Demo only · Not a sanitation approval

EXPLORE THE WORKFLOW

Connected controls, from identification to release.